Assignment title: Information
Kio Lei Use the data found in the file above, perform the following tasks. Input the data into Microsoft Project to build the project on the software; be sure to store the project file on an external media (such as on network drive or on a flash drive) using your name as the file name Use your student number as the Author and "Antiseptic R & D Project" as the project name Use the default calendar to schedule the project with 20 May 2016 as the planned start date Use an 8-hour workday and a 5-day workweek which are the default settings An engineer is assigned to supervise all installation work (Tasks n, o, and p); input that information into your project file Generate the necessary outputs from Microsoft Project to answer the following questions in a separate report in MS Word format What is the project completion date based on your schedule and what is the total project duration? What are the total slack for each of the tasks Is the engineer assigned to supervise installation work overloaded? If so, during which weeks is this engineer overloaded and therefore may need rescheduling (resource leveling)? If resource leveling is needed, what will be the revised project completion date? Requirements for submission on or before 18 May 2016: An MS Project file using your name as file name containing the project data and the original schedule (without considering resource constraints) An MS Word file with answers to the questions in Item 6 above