Assignment title: Information
Online Assessment Server Preparation Plan
Overview
IPv6 includes the deployment with the assess to the entities that includes the network topology wires, routers and the hosts which can easily be remain unchanged.
1 INTRODUCTION
For the Windows Server 2012R2, the Cisco Network Assistant has been able to optimise the wire and the wireless LAN for the growing business. This includes the planning with properly configuring and handling the management and optimisation of Cisco network.
2 PLAN OVERVIEW
The overview is based on improvement of the accuracy and the operational staff efficiency. This includes proactive planning and maximising the network security.
2.1 Description of the current network infrastructure Status
The planning of the address space is able to forecast the IP address capacity wit the basis of the number of end devices.
2.2 Server Implementation Major Tasks Check List
The setup includes the server installation and the IP setting.
Tasks Resources Criteria for successful completion of the task
1 Connect Data Cable between the first proposed server NIC to the existing school's network infrastructure UTP CAT6 Data Cables
RJ45 connections on Data Wall Plate, patch panel, and on switch LAN interface.
The lights on both the server NIC and the connected switch LAN port show Green that indicates an active status.
2
In Centralised IP Addressing Inventory with the centralised approach Used PC/NIC communications This includes the sharing of the hosts PC memory to the moving of the data between the PC and LAN.
2.3 Implementation Schedule
Time Frame Pre-Installation Activities Process/Procedure/Appropriate Personnel
Week 1 (whole week)
Visit the client and identify safety hazards on the future working area on the client site Develop risk control measures if needed, and discuss client site OSH policy with their OSH representative.
Week 2 Consultation with client/stakeholder It includes the proper setup and description of how the client and stakeholder are connected.
Week 3 Establish Communication with clients with the assessment of the business problem The communication has been for the problems
Week 4 Development of the online assessment and technical specifications. The OSH includes the policies with proper specifications.
2.4 Test the Proposed Server
Tool/Group Policy How to Apply the Tool/Policy Outcome
PING
It is a part of networking utility from ICMP protocol package.
By running PING Networking Utility in the command line interface to ping the target node's IP address or computer name, or domain name.
If can ping the target node's IP address, it means the connective between the proposed server and other nodes are working well at network layer of the OSI Reference Model.
If can ping the target node's computer name, or the LAN domain name, it means DNS server is working as it should.
Op5 This includes the monitoring of the servers with the cloud and hybrid environment. The monitoring capabilities include the real-time visibility for the graphical display of bandwidth and resource.
Monitis This includes the one-time monitoring of the websites with the network performance This provide the real-time views with the interaction charts.
PRTG The network monitoring offers the automatic discovery with network configuration. The alerts are for offering the system with the status, limit, threshold and the escalation alerts.
SeaLion It is the Linux monitoring tool which includes the issues of the web browser and the output. The performance is based on handling the instant email alerts with customised metrics.