Assignment title: Management
Event 1Curtin University has approached Prime Projects requesting advice on the most appropriate way ofcontracting/procuring the construction of a medical school on the Bentley campus. CurtinUniversity's director of Properties, Facilities and Development has suggested one of two contracts:AS 2124 General Conditions of Contract, AS 4300- 1995 General Conditions of contract for design andconstruct and a third approach through alliance or partnering procurement. This latter approach isdriven by the unusual design and infrastructure requirements for the medical school.(A copy of the AS 2124 and AS 4300 contracts can be obtained on the electronic data base at CurtinUniversity's library.)The director of Properties, Facilities and Development has asked Prime Projects to advise on themost appropriate contract arrangement for the construction of the school. In turn the executivedirector of Prime Projects has asked Cary Grant to provide a report on whether these threearrangements would be suitable.As stated above you stand in the shoes of Cary Grant. Prepare a statement that sets out the differenttype of contracts (and other procurement) Curtin University thinks is appropriate, set out theadvantages and disadvantages and come to a conclusion on what you believe to be the mostappropriate contract for the construction of the medical school.Event 2Prime Projects, in preparing the tender conditions for Curtin University adopts AS 4120 'Code ofTendering' (a copy of this Standard is available from the electronic data base at Curtin University'sLibrary). A supplementary clause placed under AS 4120 clause 6.5 'Evaluation of Tenders' states thatthe principal will evaluate the tenders on the basis of the technical qualities of the tendererssubmission (issues including the quality of the tenderers managerial system) and on a commercialevaluation (the tender price). The assessment is based on a ratio of 60:40 (60% for the tendererstechnical qualities and 40% for the tender price).At the close of the tender, Complete Contractors is the 'winning tender' and after negotiation entersinto a contract with Curtin University. An announcement is made to the losing tenderers.A losing tenderer becomes aware that Curtin University approved Complete Contractors solely onthe basis of the low fee (tender price) and did not give consideration to the technical qualities of thetenderers. The losing tenderer also believes there is evidence that Complete Contractors has notsubmitted a conforming tender. Both concerns are made known to Prime Projects.Carry Grant is to provide advice to the executive director of Prime Projects in response to the losingtenderer's claims. A copy of Cary Grants' report will be provided to Curtin University.Event 3(For this assignment assume that Curtin University has given a directive to Prime Projects to draft thecontract conditions based on AS 2124)In preparing the Annexure to AS 2124, Curtin University will need to identify the form of theperformance undertaking to ensure the proper performance of the contract. Curtin Universityproposes either security or recourse to retention monies under clause 5 of AS 2124. CurtinUniversity is concerned about the performance undertaking clause in the contract and wants PrimeProjects to set out the advantages and disadvantages of these two forms of performanceundertaking.The executive director of Prime Projects has asked Cary Grant to provide a report on the suitabilityof the performance undertaking. As stated above you stand in the shoes of Cary Grant. Prepare areport that sets out the advantages and disadvantages of these two forms of performanceundertakings and the procedures that would need to be adopted should Curtin University draw uponthe security or the retention monies for a breach by the future contactor (Complete Contractors).As this is a medical school of some complexity with an estimated cost of construction at $100 millionprovide a conclusion to your report on the most appropriate form for the performance undertakingof the contract.Event 4Curtin University has nominated a subcontractor called Trump Engineering Pty Ltd for the airhandling plant to heat and cool the medical school. This sub contract work is complex as there needsto be sterile zones within the medical school laboratories.Complete Contractors has entered into an AS 2545 -1993 Subcontract Conditions contract withTrump Engineering. This contract is identified as a 'back to back' contract with the AS 2124 contract.Complete Contractors has used Trump Engineering on a previous project and found theirmanagement style not to their liking. Complete Contractors wrote to Prime Projects expressing theirconcern at Trump Engineering being the nominated subcontractor for the air handling plant.After considering the notice that was given by Complete Contracting objecting to TrumpEngineering, Prime Projects did not support the appeal and Trump Engineering was approved as asubcontractor.Difficulties occur during the construction as a result Trump Engineering failing to conform to theconstruction critical path resulting in delay to Complete Contractors. Prime Projects has given noticeto Complete Contractors about the work being not conforming to the construction program with thelikelihood that Complete Contracting will fail to meet the contractual date for practical completion.The executive director of Prime Projects has asked Cary Grant, with reference to the contractualobligations under AS 2124 and AS 2545 contracts, to provide a report on the contractual obligationsof Trump Engineering and Complete Contractors.