Assignment title: Information
Contents
1. Introduction................................................................................................................................................................2
1.1. Project Goals and Objectives......................................................................................................................2
1.2. Purpose of this Invitation to Tender.......................................................................................................2
1.3. Form of Tenders..............................................................................................................................................2
2. BACKGROUND ...........................................................................................................................................................2
2.1. Institution's Background .............................................................................................................................2
2.2. Technical Environment ................................................................................................................................2
2.3. Current Business Systems...........................................................................................................................3
3. SCOPE AND SCALE OF SYSTEMS........................................................................................................................3
3.1. Scope....................................................................................................................................................................3
4. KEY REQUIREMENTS..............................................................................................................................................3
5. DETAILED FUNCTIONAL REQUIREMENTS...................................................................................................4
6. TECHNICAL REQUIREMENTS .............................................................................................................................4
7. COST INFORMATION REQUIRED.......................................................................................................................4
8. SUPPLIER INFORMATION REQUIRED.............................................................................................................4
9. IMPLEMENTATION REQUIREMENTS..............................................................................................................5
10. INSTRUCTIONS TO SUPPLIERS .....................................................................................................................5
Scenario..................................................................................................................................................................................6
Part 1 Design (40%)..........................................................................................................................................................6
Part 2 Report (50%) .........................................................................................................................................................6
Part 3 Presentation (10%) .............................................................................................................................................6ADVANCED NETWORKS
UKF - Replacement of Trading Floor Network
Invitation to Tender
1. Introduction
UKF uses 2 trading floors in Manchester. The network in one of these is in urgent need of
replacement. It no longer meets the stringent demands for availability and performance
required for today’s trading floors. All hardware and cabling requires updating along with
the design. We are looking for a solution that will not only meet current needs but will be
future proof for the next 5 – 10 years, and so continue to deliver a service level that meets
our needs for the foreseeable future.
1.1. Project Goals and Objectives
Key goals and objectives for the new network include: -
High performance
High availability
Flexibility, allowing for a range of devices including mobile devices
Manageability, a network that will be cost effective to run and provide a lower Total
Cost of Ownership (TCO) than our current network.
1.2. Purpose of this Invitation to Tender
This ITT lays out in detail the requirements for the new network, this includes any
constraints and limitations. It provides all of the information required for the tender process
including specific requirements.
1.3. Form of Tenders
Tenders will take the form of a report that will include all network diagrams and a detailed
discussion of design decisions. The report will make clear links between specific
requirements and how the design will address these.
2. BACKGROUND
2.1. Institution's Background
UKF is one of the leading financial institutions in the UK today, we own two of the key
trading floors in Manchester. Our Head Office is based in central London, and we have
regional offices in Birmingham, Manchester and Edinburgh. We provide financial services
for a wide range of British businesses and industries. 3
2.2. Technical Environment
Our technical environment is as follows: -
Currently running with Windows on the desktop. Each desktop has 3 network
connections.
Servers are a mix of Windows and Linux
Using TCP/IP – currently using IPv4
Networks –
o Using Layer 2 switches, and router.o OSPF for internal routing
2.3. Current Business Systems
Business systems that the new network must support: -
Email
Trading floor systems
Financial systems
Payroll
Purchasing
Office applications
3. SCOPE AND SCALE OF SYSTEMS
3.1. Scope
The scope of this project is limited to our 2nd trading floor in Manchester. This includes the
network services to the trading floor itself as well as services to the support office which
must provide all services listed in section 2.3.
The trading floor will support 600 traders. There are 45 support staff and a management
team of 15. All staff require a desktop PC. At present there are 30 networked printers in a
room just off the trading floor. Management staff have their own networked printers.
The trading floor and support services operate on core hours of 6am to 6pm.
4. KEY REQUIREMENTS
Performance
o All trading floor transactions must complete in less than 1ms
o All supporting transactions must complete in less than 5ms
Availability
o Trading floor availability must be 99.999%
o Support services availability must be 99%
Flexibility
o The network must be able to support wireless mobile devices, though not with the
same availability requirements
Future Proof
o The new design must guarantee to meet the above requirements for the next 5
years.
Security
o Secure external link to the Internet
o Secure connection for remote workers
o Internal security mechanisms, including access controls
Cost Effective
o Overall TCO lower than current TCOo Manageable services that will reduce power usage and maintenance
requirements
5. DETAILED FUNCTIONAL REQUIREMENTS
We require a new network that will meet the key requirements outlined in Section 4. The
network will handle all of the data traffic for one of our central London trading floors. The
data traffic from traders themselves must be handled with high performance and availability
requirements. The requirements for all other traffic are less rigorous.
The new network must continue to provide this level of service for a minimum of 5 years,
and so must be designed with this in mind. The network must provide a cost effective
solution. The organisation is aiming to reduce its overall power usage by 25% over the next
10 years and so the new solution must be able to provide significant improvements on
power usage.
6. TECHNICAL REQUIREMENTS
Technical requirements
Protocols
o IPv6 required
Subnet designs must be provided
o OSPF or alternative internal routing protocol
o Ethernet required
o VLAN designs are required
o Other protocols such as STP should be covered
Cabling – choice of cabling dependent on provider
A wireless segment must be provided, and secured
Security
o Perimeter security is required
o Internal security measures must be explained
o An IDS/IPS is required
Ports
o All desktops must have at least 3 ports
7. COST INFORMATION REQUIRED
For the purposes of this exercise no cost information is required though information on
power saving can be included. An explanation of how TCO is being kept to a minimum is also
required.
8. SUPPLIER INFORMATION REQUIRED
8.1. General Information
8.2. Proof of Supplier's sound Financial and Company Standing
8.3. Evidence of Capacity to Deliver Contract Requirements
8.4. Other9. IMPLEMENTATION REQUIREMENTS
An overview of how the network will be implemented is required however dates/times etc.
are not required.
10. INSTRUCTIONS TO SUPPLIERS
See ICA for instructions on Submission.Scenario
AMY Networks is a consultancy business that designs, installs and operates networks for
clients in the financial sector. As one their project leaders you have been asked to
responding to an ITT (Invitation to Tender) for a network design, installation and operation
for a trading floor. The network will include providing services for the back office teams as
well as traders.
The ITT document is included with this ICA. The tender that you produce in response to the
ITT should take the following form.
Part 1 Design (40%)
You need to respond to the ITT with following documents: -
Logical Design. This must take care of the 3 connections per desktop. The switch
design capacity must take this into consideration. You must indicate the total
number of switches the design will use along with your calculations. Assume a 24 or
48 port switch for your design.
Associated Design documents:
o Design an IPv6 subnetting scheme for the control centre. Use the following IPv6
address: 2001:0DB8:0002:/48
o Specify how you will allocate IP addresses to the different blocks in the new
design.
o A minimum of 16 subnets are required by the trading floor.
Part 2 Report (50%)
The report must provide a description for the design and all of the decisions that you have
made in the process of developing the design. This will include a discussion of the design,
technologies, protocols (Restrict your discussion to Layer 1, 2 and 3 protocols) and security
measure that you have decided to use.
Part 3 Presentation (10%)
Marking Criteria
Part 1- Design Marks
Logical Design To obtain maximum marks you need to :-
Produce a detailed, documented network
diagram in response to the information provided
in the ITT. Your design will consist of diagrams
for the campus and sensor network
Your design should clearly show the measures
you have included that address the business and
technical requirements. The document should be
professionally presented using a tool such as
Visio.
20%.
Addressing scheme To obtain maximum marks you need to :-
The design should include a valid subnet
solution along with explanation. The subnet
must map to the design diagram and business
requirements.
.
20%
Total 40%
Part 2 – Design Report (2500-3000 words) 50%
Discussion on model,
design and business
requirement
To obtain maximum marks: -
The report must provide a description for the
model, design and all of the decisions that you
have made in the process of developing the
design and how these are linked to the business
and technical requirements describe in the ITT.
20%
protocols To obtain maximum marks: -
The report must clearly identify and discuss the
relevant protocols and hardware used to design
this network and how the protocols meet the
requirements in the ITT.
20%
Security To obtain maximum marks: -
The report must include a discussion on security
measures used to protect network.
10%
Total 50%