Assignment title: Management
V.01 12/2016
Rubrics for Senior Graduation Project one
Unacceptable Needs a lot
Improvement
Needs some
improvements
Acceptable Meets Expectation Total
Marks
Literature review There is no existing
work relevant to
problem domain is
described.
(0 Mark)
Partial description of
one existing work
relevant to problem
domain is given in the
report.
(1.5 Marks)
A complete description
of only one existing work
relevant to problem
domain is given in the
report.
(3 Marks)
Two Or more existing
works relevant to the
problem domain are
partially described in
the report.
The references to the
existing works given
are in correct format.
(4 Marks)
A complete description
of three or more
existing works related
to the problem domain
are given in the report
with accurate
references.
(5 Marks)
Problem statement/scope Problem statement does
not define a valid
problem. Scope of the
project is not given in
the report.
(0 Mark)
Problem statement
defines a problem but
does not highlight its
complexities and
challenges.
Scope of the project is
not defined.
(1.5 Marks)
Problem statement
defines the problem
clearly. However, scope
of the project is incorrect
OR inconsistent.
(3 Marks)
Problem is clearly
defined, including the
complexities and
intricacies involved in
problem domain.
Scope of the project is
correct but partially
defined.
(4 Marks)
Problem is clearly
defined and explains
the underlying
challenges and
complexities. The
Scope of the project is
clearly defined,
including the risk
assessment.
(5 Marks)
Rational for choosing
the methodology
Report does not narrate
the development
methodology suitable
for solving the problem.
(0 Marks)
Report narrates a
development
methodology without
giving a rational for
selection of
methodology.
(1.5 Marks)
Report narrates a
development
methodology but gives a
partially correct rational.
The reports does not
mention alternatives.
Report narrates a
development
methodology and gives
a valid reason for the
selection of
methodology. (4
Marks)
Report narrates a
development
methodology as a
suitable approach to
solve the problem. The
methodology is
compared with
different alternatives
and a clear rational is
given for the suitability
of the selected
methodology.
(5 Marks)
Project requirement
specification
The requirements
associated with the
The requirements
associated with the
The requirements
associated with the
The requirements
associated with the
The requirements
associated with theV.01 12/2016
project are not
specified at all.
(0 Mark)
project are not
enough specified.
Three functional
requirements or less
(3 Marks)
project are specified
but need some
improvement.
Three functional and
two non- functional
requirements
(5 Marks)
project are specified
as clearly as
possible. Seven
functional and
Three nonfunctional
requirements
(10 Marks)
project are specified
clearly and
properly. Eleven
functional and Four
non- functional
requirements
(15 Marks)
Project plan & Project
management
No evidence of
planning (0 Marks)
Little project planning.
Gantt chart available
but WBS is missing
(6 Marks)
Basic planning and time
management needs
necessary for project
completion met. . Gantt
chart available but
resources are missing
(12 Marks)
Utilize resources in
completion of tasks;
Appraise efficiency
and effectiveness in
completion of task in
meeting goals and
Critical path is
highlighted
(16 Marks)
Exhibits a professional
level of planning and
time management and
complete Gantt chart
(20 Marks)
Detailed analysis The report does not
contain any deliverable
analysis that will guide
the work during the rest
of the project
(0 Mark)
The report does not
contain enough
deliverable analysis that
will guide the work
during the rest of the
project. Report Contains
ER diagram. However,
there are no Use-Case
and class diagrams
given in the report.
(2 Marks)
The report contains a
certain analysis that will
guide the work during
the rest of the project.
But some points need
improvement. Report
contains ER diagram, a
use- case diagram with
description of each usecase. There is no class
diagram given in the
report.
(6 Marks)
The report contains a
professional and
complete analysis that
will guide the work
during the rest of the
project but some
elements need to be
detailed.
The report contains
ER diagram, Usecase diagram and
description of each
use-case is given
proper.
A class diagram is
given however, the
relationship
between classes are
not refined.
(8 Marks)
The report contains a
professional and
complete analysis that
will guide the work
during the rest of the
project.
The report contains ER
diagram, Use-case
diagram and
description of each
use-case. A complete
class diagram is given
in the report.
(10 Marks)V.01 12/2016
Initial design The idea of the
project is not
explored nor
elaborated
(0 Mark)
The idea of the
project is not enough
explored and not
elaborated.
The report contains
relational schema of
the ER diagram given
in "Detailed
Analysis". There is
no Sequence diagram
given in the report.
(2 Marks)
The idea of the
project is explored
and elaborated but
some points need
improvement. The
report contains a
correct relational
schema. Sequence
diagrams for two usecases are given in the
report.
(6 Marks)
The idea of the
project is clearly
explored and
elaborated
but some attributes
need to be detailed.
The report contains
a correct relational
schema. Sequence
diagrams for four
use-cases are given
correctly in the
report.
(8 Marks)
The idea of the
project is clearly
explored and
elaborated. The
report contains a
correct relational
schema.
Sequence diagrams
for all use-cases are
given correctly.
(10 Marks)
Presentation The student did not
show up at all for the
presentation
(0 Marks)
Only TWO points are
only fulfilled from the
points mentioned in the
last column
(4 Marks)
Only THREE points are
only fulfilled from the
points mentioned in the
last column
(6 Marks)
Only FOUR points are
only fulfilled from the
points mentioned in
the last column
(8 Marks)
Confidence
Eye Contact
Clarity of
presentation
Ability of organizing
and presenting
information
accurately
Ability of drawing
relevant and useful
conclusions
(10 Marks)
Involvement in Project
activities.
Was generally
unreliable in
completing work
activities; did not
follow instructions and
procedures promptly or
accurately; was
careless, and work
needed constant followup; required close
supervision (0 Marks)
Was Partial follow
instructions and
procedures promptly or
accurately to complete
the work
(3 Marks)
Was generally
reliable in completing
activities; normally
followed instructions and
procedures; was usually
attentive to detail, but
work had to be reviewed
occasionally;
(6 Marks)
Was generally
reliable in completing
activities; normally
followed instructions
and procedures; was
usually attentive to
detail, but work had to
be reviewed.
(8 Marks)
Was consistently
reliable in completing
work activities;
always followed
instructions and
procedures well; was
careful and
extremely attentive to
detail; required little
or minimum
supervision
(10 Marks)V.01 12/2016
Submission of draft
chapters of the report
The supervisor can allocated the marks based on :
1. Submission of Project Initiation Report (2 Marks)
2. Introduction (2 Marks)
3. Literature Review & Feasibility Analysis (3 Marks)
4. Methodology (3 Marks)