Assignment title: Information
ASTON UNIVERSITY
SCHOOL OF ENGINEERING AND APPLIED SCIENCE
EC211C: Estimation and Measurement
Assignment II – 2016-17
1. Aim of the Assignment
Principal aim of the assignment is to provide an understanding of measurement of building
works.
2. Assignment Brief
A new housing development project is currently being planned for Stratford-upon-Avon.
GallifordTry has been appointed as the management contractor for the project. They are
currently in the process of designing a marketing suite for this housing project. ‘Useful
Structures’ have been appointed as the architects, and they have now developed the design.
The consultancy company that you are working for (CostimeConsultants) has been approached
by GallifordTry to get a full BoQ developed for this marketing suite.
You have been provided with the updated versions of available drawings and specifications.
You are required to take off quantities, in accordance with NRM2, for following building works;
substructure, masonry works, roof, internal partitions, doors and windows, internal finishes (wall,
floor and ceiling).
You are not required to take off quantities for electrical services, water supply and drainage,
bathroom and pantry fittings, and external cladding.
You are required to make sensible assumptions for any information not provided in drawings or
specifications. Any assumptions made should be reported in a query sheet.
Part 1 (40%)
Take off substructure work up to the DPC level (including DPC and screed bed) in dimension
sheets.
Marks will be awarded for:
1. Take-off list and introductory information;
2. Accuracy of dimensions;
3. Correct descriptions compliance with NRM2 rules;
4. Clarity and comprehensibility of method;
5. Setting out and presentation of dimensions;
6. Queries raised and assumptions made.
Part 1 needs to be submitted to the school office in hardcopy.
Part 2 (60%)
Take off remaining works and develop a Bill of Quantities (BoQ). Final BoQ needs to be
prepared using QSPro software. Your submission should include;
1. Taking off for remaining works; masonry works, roof, internal partitions, doors and windows,
internal finishes (wall, floor and ceiling). You can either present these in dimension sheets
or as a QSPro file.
2. Query sheet
3. An unpriced BoQ (including substructure)3. Additional information / clarifications
Further clarifications will be provided in the class as and when required. I have also created a
module forum within the Blackboard module where you can ask questions.
4. Date issued: 27/02/2017
5. Date of submission:
Part 1: 27/03/2017 (Submitted to the school office in hardcopy)
Part 2: 02/05/2017 (BoQ to be submitted electronically. Taking off work to be
submitted either electronically or to the school office)
Drawings attached:
Plan of the marketing suite
Elevations
Cross section of foundation and external wall
Landscape layoutSpecifications
Groundwork
Finished ground level to be as existing ground level
Topsoil strip 150mm below existing ground level to be preserved onsite for landscaping
Filling: Imported hardcore filling finished with sand blinding
Foundation
Foundations and bed: Plain concrete grade 20N/mm2
Filling to hollow wall: Plain concrete grade 10N/mm2
Masonry
Brickwork to be commons: BS3921 in gauged mortar (1:1:6)
Blockwork: Precast lightweight concrete blocks, BS6073, 440 x 215 x 100mm in gauged mortar
(1:1:6)
Wall ties (4 Nr/m2): Galvanised butterfly type
Damp proof course: Hyload pitched polymer sealed with Hyload contact adhesive in gauged mortar
Cavity wall insulation: 50mm Rockwool partial fill cavity slabs
Floor
Damp proof membrane: 1000 gauge polythene sheet
Engineered hardwood timber flooring in all areas except bathrooms, finished thickness 14mm
Matt stone effect floor tiles to bathrooms
Roof
Precast Hollowcore composite concrete roof slab including 100mm thick Rockwool insulation,
Polyurethane waterproofing, 2 coats of bitumen roof seal and rainwater goods
Internal partitions
Gypwall manufactured by British Gypsum Ltd, 164mm thick, comprising frame of studs at 600
centres, head and floor channels, boarding of 1 layer of 15mm soundbloack board with tapered
edges, taped seamless joints, 25mm Gypglass 1200 insulation, sealant applied to all perimeters,
drywall coatover primer, and 2 coats of emulsion paint as specified by the architect, fixed in
accordance with manufacturer instructions.
Wall and ceiling finishes
2 coasts gypsum plaster to block walls and underside of the concrete roof
2 coats of premium quality emulsion paint to walls and underside of the concrete roof
Matt stone effect walls tiles to bathroom walls
Doors and windows
Double glazed c/w entrance double door to front including the door frame
Double glazed c/w entrance door to the office including the frame
Internal doors to be moulded 6 panel textured doors with wood effect, 2100mm high and 40mm
thick, including the door frame and all ironmongery
1200w x 1200h double glazed fully opening vent window including the frame to kitchen
NOTE WELL: You do not have to measure electrical services, water supply and drainage, external
cladding, furniture, bathroom and kitchen fittings.