Assignment title: Information
Task 1: Incorporate Energy Plus Simulator into MatLab. Task2: We've to develop Data-Center building in MatLab/Energy plus. Task3: We've to develop system for Heating/Cooling by following the requirement of Data-center. Task4: we've to specify real amount of heat produced by Data-Center and we can specify our own heat produced by the Data-Center (ie. 10,000W-hr, 20,000W-hr and so on. we can manually change inside temperature from 5 degrees to 45 degrees etc. Likewise the temperature is cold outside (20 degrees) make sure the the Air-cons should not start producing heat inside to bring the temperature to 23-25 degrees or more). Task5: We can utilize the outside cold temperature instead the use of Air-cons to cool down the Data-Center inside. Task6: If humans are working inside Data-center we've to set the ambient temperature to human comfort level. (23 to 25 degrees) Task7: Human beings working can be schedule based on weather data ( in winter people can schedule to work in day-timing because it will require less energy to heat during day-time, in summer they can be shifted in a night shift because it will require less energy to cool during nights.) This system should generate the report monthly/annually including all Peak-time/Off Peak-time details of Cooling/Heating, and also to draw a graph from available data generated by report. if you are familiar with energy plus all the above tasks can easily be incorporated