Assignment title: Information


CPCCBC5005A: Assessment 4 What you have to do Complete two of the following three parts (i.e. complete Part 1 and Part 3, or, complete any other combination of two parts). Do not complete more than two parts as any additional parts submitted will not be marked. This is an ungraded assessment, and your submission will be assessed as Competent or Not yet competent When doing this assessment make any assumptions you need, but be sure to state what you have assumed at the beginning of each part of your assessment. Most Parts of this Assessment relate to the following Project: 19735 Project Medium Rise Apartments Job Address: 2135 The Boulevard, Strathfield, NSW Job Title: Proposed Commercial and Residential Development Client: AKM Developments Architect: Olympic Designs, 55 Olympic Pde, Homebush, NSW You should obtain the following documents for the job, from the Learning resource tab for the unit on the OLS: Plans: 16 pages Bill of Quantities: 6 pages Specification of Works: 60 pages Task Part 1 Assume you are the site manager in charge of the construction of the Strathfield apartments with the above documentation, and that it has been decided to use AS4000 as the standard form contract for the project, and AS4901 as the subcontract. Obtain a copy of AS4000 & AS4901. You can download a copy from Saiglobal using the online TAFE library access method described on the OLS Course information page. Also obtain the construction schedule for the project - this was provided in the assessment for unit CPCCBC5002A – refer to the OLS Assessment information link for the unit if you need a copy. • Review the collected documents, and identify what subcontractors you need to build the project. LA018492 Assessment 4 CPCCBC5005A Ed 1 1 © New South Wales Technical and Further Education Commission, 2014 (TAFE NSW – WSI), Version 1, October 2014You need to familiarise yourself with the project to do this. This involves inspecting each plan briefly – as a minimum inspect each plan for a minute or so initially to see what it contains, and the general arrangement. Also briefly review the BoQ and specification. a. Prepare a list of subcontracts that you will need for the project, and then order the list into your preferred construction sequence. Use this list to create a call forward sheet for the project which you need to submit for marking. A call forward sheet template is provided in the Assessment information link. Determine and show on the call forward sheet the work day number that each contractor is required to commence on site - i.e. Day 5, Day 20 etc. - do not use dates. Also assume that work starts on site on Day 1. Clearly describe on the call forward sheet what items of work this contractor is to do. When determining the subcontractors required, make sure you identify any requirements for specialist skills, requirements or competencies, and note these on the call forward sheets. Do not fully complete other aspects of the call forward sheet. b. Use all relevant information you have collected to develop a formal organisation layout for the project – this should show how you would structure the labour on the project and include both labour for direct employees and subcontractors. Note your structure needs to conform to requirements of AS4000 contract conditions, and should assume that the principal will supply plans and specification but not a Bill of Quantities to the contractor (AS4000 Clause 8.3) A simple example management structure for a project that includes both design and construction is shown in Figure 1 below. c. Prepare a list of special conditions of contract that you would want to use with subcontractors on the project. Assume that you intend to use AS4901 as your subcontract generally on the project. (AS4901 is a companion document specifically prepared to be compatible with AS4000.) Consider whether to include or omit for example coverage in the following areas: • WHS • Environmental planning • Industrial relations • Co-ordination of works • Quality • Prior works • Protection of works • Programming i.e. clause 33 of AS2545 • Dispute resolution • Services to be provided by contractor in relation to materials handling, crane, man and material hoist, toilet facilities and power and on which level. i.e. is Subcontractor responsible for unloading trucks, and the provision of any site sheds etc. • Back charges • Insurance • No further claims clauses – i.e. at the end of job, or within 21 days or forfeit • Contractors right to dismiss – i.e. contractor retains the right to dismiss employees from site for reasonable cause, or for any cause the builder considers reasonable, or at the builders discretion, with a requirement for arbitration, and whether to include safety, non-performance etc. • Novation or assignment of subcontract • Contractor power to vary or omit works – i.e. contractor can vary • Essential services certificates – i.e. subcontractor to provide essential services certificates for work completed prior to any termination • Prior work - i.e. the subcontractor is deemed to accept the adequacy and completeness of the prior work as soon as he commences work on the prior work, and make no claims for variations for the inadequacy of prior work. 2 LA018492 Assessment 4 CPCCBC5005A Ed 1 © New South Wales Technical and Further Education Commission, 2014 (TAFE NSW – WSI), Version 1, October 2014(i.e. subcontractor can issue non-conformance certificates as part of their QA process. • Termination for convenience d. Submit each item above to complete this part, namely submit Items a, b & c being the call forward sheet, and formal contractor / subcontractor structure, and the special conditions of contract for this part of your assessment. LA018492 Assessment 4 CPCCBC5005A Ed 1 3 © New South Wales Technical and Further Education Commission, 2014 (TAFE NSW – WSI), Version 1, October 2014e. Waterproofer Tiler Plasterer General Forman Forman Services & Facade Forman Forman Finishes Structures Leading Hand Leading Hand Leading Hand Client Project Manager Head Contractor Design Team Direct Workforce Sub Contractors Formwork Reinforcement Concreter Masonry Excavation Electrical Fire Mechanical Hydraulic Lift Crane Hoist Structural steel etc etc Joinery Fire door Metalworker Carpenter Curtain walls Door/window Landscaping Renderer Painter Glazing Paving Access 4 LA018492 Assessment 4 CPCCBC5005A Ed 1 © New South Wales Technical and Further Education Commission, 2014 (TAFE NSW – WSI), Version 1, October 2014Part 2 Select subcontractors In this part you need to compare and evaluate subcontract quotations for formworker and concretor work and determine which should be used on the Strathfield Apartment project. You are to assume that you are the Project Manager for the multi storey unit development and your program requires you to let the subcontract for CONCRETE and FORMWORK for the project urgently. You elect to use a Dincel reinforced concrete wall system instead of basement block walls shown for its speed advantage. You have received the attached four (4) quotations from the purchasing officer for the works. Analyse and compare these quotations by comparing them with your original tender budget for this work and decide which is the most cost and time effective so that a sub contract can be raised. All the subcontractors have successfully done work for your company previously and are deemed equally proficient as each other to effectively carry out the specified works. Liquidated damages on the project are $4,500 per day. Builder's site O/H costs are $2,000 per day. Assume all activities are programmed on the critical path. Use the following tender budgets for your comparison. ESTIMATOR'S TENDER BUDGET INFORMATION: Concretor Package No.1 Supply, place and finish reinforced 32MPa concrete and associated formwork and falsework supports to basement floor slabs, ramps and dincel walling up to and including the level 1 floor slab. (Note: waste is included in $ rates but not in measured quantities) - Total concrete volume (excluding waste) 527m3 • Basement slabs beams and columns 305m3 • Ramps between basement slabs 57m3 • Dincel reinforced concrete walls 165m3 - Total contact surface areas: • Slab on ground 684m2 • Suspended slabs and ramps from basement to level 1 1,310m2 a. Formwork and falsework to suspended slabs, beams & columns b. = 1,310m2 x $100/m2$131,000 c. S&P reinforcement = 150kgs/m3 x 527m3 x $2,200/tonne – takes 15 days $173,910 d. Supply conc. for slabs beams col. walls incl. waste 527m3 x $205/m3 $108,035 e. Cost to place conc. to slabs, beams, columns & walls 527m3 x $35/m3 $18,445 f. Cost to finish slabs and ramps 1930m2 x $5.85/m2 $11,302 g. Supply concrete pump/s (12 setups i.e. 12 x $1,000) $12,000 h. Allowance for concrete testing $3,300 i. Termite control = 684m2 @ $5.20/m2 $3,557 j. S&P 50mm sand blinding = 684m2 @ $3.80/m2 $2,600 k. Supply 50mm sand blinding = 684m2 @ $1.80/m2 see above l. Supply 'Fortecon' membrane = 684m2 @ $1.97/m2 $1,347 m. 'Fortecon' membrane /m2 place only = 684m2 @ $5.90 $4,036 n. Chemically cure slab = 1,368m2 @ $2.65/m2 $3,625 o. Allowance for rubbish removal $2,000 p. Hoisting allowance for concretor/formwork/steelfixers $6,000 q. Sheds allowance as supplied by Builder $2,000 LA018492 Assessment 4 CPCCBC5005A Ed 1 5 © New South Wales Technical and Further Education Commission, 2014 (TAFE NSW – WSI), Version 1, October 2014Total Concretor trade budget $483,157 Note: Formwork and falsework cost above includes to S&P Dincel. Concrete includes a waste allowance of 5% on measured quantity from drawings. Reinforcement quantity of 150kgs/m3 concrete is the theoretical reinforcement quantity, and a rolling margin of +5% is to be expected if trucks loads are weighed. It is estimated that 12 concrete pump setups will be required to complete the works. A normal working day is deemed to be from = 7am to 3.20pm and includes 20 mins extra per day to accumulate a rostered day off once every 4 weeks. The work is expected to take 65 working days. 6 LA018492 Assessment 4 CPCCBC5005A Ed 1 © New South Wales Technical and Further Education Commission, 2014 (TAFE NSW – WSI), Version 1, October 2014Ultimate Concrete Services Pty Ltd 21 Foundry Road, Penrith NSW 2751 Phone: (02) 88667733 Facsimile: (02) 88667734 ACN: 654 321 557 Contractor Licence: 222 111 555 Quality Concreting and Formwork Services for the Construction Industry 11th September, 2014 The Manager Best Constructions Pty Ltd 52 Pearl Street, Liverpool NSW 2170 Attention: John Smith Dear John, Re: Job No. 09/14 - 2135 The Boulevarde, Strathfield · Concrete & Formwork Tender. In reference to your invitation to tender dated the 20th August 2014 for the above project, we hereby submit details of our lump sum prices to carry out these works. Complete reinforcement and concrete works on a supply place and finish basis to all concrete slabs, beams, columns and walls (including Dincel basement walls) from basement to and including level 1 slab, but excluding formwork = $305,520 All necessary formwork requirements = $92 /m2 (surface contact area of concrete to be measured on stripping). Our day labour rate is $68 /hr normal hours. Our tender includes the following items as requested: • all necessary testing as per code • supply and place membrane • place only sand blind, material supplied by others • all termite treatment, as per specification • removal of all rubbish generated off the site • all concrete pumping; up to eight (8) setups, additional setups $750 ea. • estimate time to complete is 70 working days. Builder to supply the following: • all lunch, change & toilet facilities in accordance with union requirements • all hoisting facilities, except concrete placement • curing concrete surfaces Our quotation is valid for a period of 30 days from the date of this quotation. Yours sincerely, Anthony Blanski, Manager LA018492 Assessment 4 CPCCBC5005A Ed 1 7 © New South Wales Technical and Further Education Commission, 2014 (TAFE NSW – WSI), Version 1, October 2014Professional Formwork and Concreting Services Pty Ltd Offering the Builder a complete concreter trade 20.years of services to the industry Unit 5/41 Barry Crescent, St Leonards NSW 2067 Phone: (02) 9555-2367 Facsimile: (02) 9555-2366 ABN: 34543362155 Contractor Licence: 7548623 15th September, 2014 The Manager Best Constructions Pty Ltd 52 Pearl Street, Liverpool NSW 2170 Attention: John Smith Dear Sir, Re: Job No. 09/14 - 2135 The Boulevarde, Strathfield Formwork & Concrete quotation With reference to your invitation to tender dated the 20th August 2014 for the above project, we hereby submit our tender subject to Rise & Fall as per 'NCAP2 formula. Concrete testing $8 m3 Place only and finish concrete slabs $48/m3 Concrete pump setups $500 / setup Termite control $6.00 /m2 50mm sand blinding (supply and place) $4.30 /m2 Place only membrane, supplied by others: $7.00 /m2 Supply, place and strip formwork: $110.00 /m2 Note: Concrete is to be supplied by others, no steel reinforcement or curing of concrete allowed. Our rates include removal of any rubbish generated from these trades and hoisting of materials. To assess the total concrete quantities, we require payment on the basis of concrete truck delivery dockets. Builder to supply shed accommodation for workers. Our rates are subject to Rise & Fall from the date of this quotation. This quotation is valid for a period of 60 days. Our estimation of time to complete these works is 53 working days, provided other trades are carefully coordinated. Day labour, if required is $70 /hr normal working hours. Assuring you of our closest cooperation expediting this project. Yours faithfully, Frank Nassif Director 8 LA018492 Assessment 4 CPCCBC5005A Ed 1 © New South Wales Technical and Further Education Commission, 2014 (TAFE NSW – WSI), Version 1, October 2014Quality Concreting Pty Ltd We always meet the quality mark 62 Wentworth Avenue, Thornleigh NSW 2120 Phone: 9555-3434 Facsimile: 9555-2626 ACN:454654544 Contractor Licence: 64813235 8th September, 2014 The Manager Best Constructions Pty Ltd 52 Pearl Street, Liverpool NSW 2170 Attention: John Smith Dear Sir, Re: Unit Block - 2135 The Boulevarde, Strathfield Formwork & Concrete Tender Further to tender documents dated 20th August 2014, we have pleasure in submitting our firm lump sum tender for concreting and formwork to the above project, in accordance with tender documents supplied. All formwork as detailed to basement slabs beams columns and ramps $115,800 All reinforcement and concreting works on supply place and finish basis to basement slabs beams columns ramps & Dincel walls to and including level 1 slab $305,400 TOTAL $421,200 Our day labour rate is $75 /hr normal hours. We have included eight (8) setups of a concrete boom pump only, additional setups are $750 each. We have included to supply sheds/ amenities for our own work force. We have not included for any concrete testing, curing or hoisting, except limited pumping. We have not included for sand blinding, 'Fortecon' slab underlay, termite control or rubbish removal. We assure you of our utmost cooperation in the expediting of the works. We estimate that the works will be completed in 70 working days from possession of a clear site after completion of bulk earthworks, sand blinding and membrane placement by others. Yours sincerely, Mark Power Manager LA018492 Assessment 4 CPCCBC5005A Ed 1 9 © New South Wales Technical and Further Education Commission, 2014 (TAFE NSW – WSI), Version 1, October 2014P & W Concreting Services Pty Ltd Unit 12 / 5 Mars Road, Parramatta NSW 2124 Phone: (02) 9555 6776 Fax: (02) 9555 6777 ABN: 36776532455 Contractor licence: 9174625C Concretors - Reinforcement Fixers - Formworkers. No job too small or too big Working to QUALITY MANAGEMENT SYSTEM compliant with ISO 9001 13th September, 2014 The Manager Best Constructions Pty Ltd 52 Pearl Street, Liverpool NSW 2170 Attention: John Smith Dear John, Re: Project: 2135 The Boulevarde, Strathfield Quotation for Concrete & Formwork We have pleasure in submitting our quotation for the following works on the above project, as per documents enclosed in your 'invitation to tender' dated the 20th August 2014. Our quotation is valid for 30 days, after which time we reserve the right to revise the quotation. We have included an allowance for the following: - Supply, place and strip class 2 suspended formwork $95/m2 - Supply and place steel reinforcements to slabs beams and walls $2,200/t (Reo quantity based on weighbridge load calculations not delivery dockets) - Supply, place and finish 32 MPA concrete $198/m3 (Concrete quantity to be taken from concrete truck delivery dockets) - We have allowed for 12 only concrete pump setups, additional setups will be charged at $480 each - We have included termite control and sand blinding and laying only of the membrane. We have excluded the following Items: - No allowance for the supply of membrane - by others. - No allowance for curing of concrete - by others. - No allowance for concrete testing - by others. - No allowance for hoisting of materials or supply of workers sheds. - No weekend work or work after 4pm. - No removal of any rubbish generated by this trade off the site Our day labour rate is $67.00 per hour normal time. We have estimated that the works would be completed in 72 working days. Should you require any additional information please contact the undersigned. Yours faithfully Anthony Oussa Estimator 10 LA018492 Assessment 4 CPCCBC5005A Ed 1 © New South Wales Technical and Further Education Commission, 2014 (TAFE NSW – WSI), Version 1, October 2014Part 3 Manage subcontractors In this part you need to develop a range of documents and procedures for use managing subcontractors over the life of a building project similar to that detailed and used on the Strathfield Apartment project. a. Prepare a subcontractor pre award interview template that you can use when assessing and comparing the merits and suitability of lowest tenderers. Many companies include in their subcontracting procedure a requirement that the lowest 2 tenderers are interviewed. The template is to be used to record the interview and determine whether the subcontractor has allowed for all work needed. It should include adequate coverage of the following areas: • General contract, special conditions and pricing • Suitability (licencing, insurance, supervisors, number of workers, financial, other projects etc.) • Programming (working week length, start & finish dates etc.) • Insurance (kinds, currency and policy numbers etc.) • Code of Practice compliance • Safety • Quality assurance • Ancillary, incidental and contractual items, and builders work with the trade (i.e. crane, hoisting, storage, penetrations.) • Schedule of facilities/services/plant and whether supplied by builder or tenderer • Payment conditions • Authorised parties signatures f. Prepare a procedure (that is a brief written description of requirements) and a template for the selection of subcontractors not currently on the company books Make sure you include the selection criteria to be used, how to gather information about previous work history, and requirements for qualification, licence and credit checks. g. Describe the communication process to be adopted and used by subcontractors on the site i.e. printed or electronic, mail or web based, site meetings, etc. to facilitate document distribution, access, retention, verification and checking of communications h. Prepare a procedure (that is a brief written description of requirements) and templates for use in the performance management of subcontractors. You should consider and include in the procedure the following 2 (two) aspects: • How to deal with poor subcontractor performance. Outline steps you would take to conduct a performance interview with a subcontractor about unsatisfactory work quality, speed of work etc. Include key questions you would ask, activities you would include in any action plan, and details of the monitoring you would undertake to ensure that poor performance does not happen again. Explain which staff you would interview to investigate the poor performance. Provide a template for use to record a meeting about unsatisfactory performance under the contract and record agreed solutions. • How to evaluate and record and summarise overall subcontractor performance on completion of the work. The procedure can state who should evaluate performance i.e. job supervisors/site managers and the items to be considered. Also provide a template for use to record the evaluation. Areas you could consider in the overall performance evaluation include time, cost, quality, environmental, WHS, personnel, industrial relations and similar parameters. Include a place on the template to record a recommendation whether to reuse. Will the outcome be disclosed to subcontractors? i. Prepare an outline of items to be explained at the site induction of contractors on the project, including any commencement forms and paperwork that would need to be completed. LA018492 Assessment 4 CPCCBC5005A Ed 1 11 © New South Wales Technical and Further Education Commission, 2014 (TAFE NSW – WSI), Version 1, October 2014Submit each item above to complete this part i.e. Items a, b, c, d and e. Checklist I have: • answered all questions in the space provided • clearly identified my answers • Included my name, Student Number, Unit Number, Assessments Number. • Reviewed and spell checked my document. • Saved a copy of the assessments on my own computer. 12 LA018492 Assessment 4 CPCCBC5005A Ed 1 © New South Wales Technical and Further Education Commission, 2014 (TAFE NSW – WSI), Version 1, October 2014