NIT1104 – GROUP PROJECT/2017 S1 Student ID Student Full Name Project description Design an Ethernet LAN for level 5, building D Footscray Campus, Victoria University. D5 floor plan can be downloaded from VU Collaborate. • Computer labs are painted in green. Each PC lab has 20 computers and 1 printer • Offices are painted in pink. Each office room can connect 4 computers. • The technical room is painted in cyan where the main switches and routers are located Design requirements: - Each PC lab is on a separate IP sub-network - All office computers are on a single IP sub-network - The LAN is connected to the main campus network and the Internet using a FastEthernet fiber optic link (100Base-FX). Assume that the default gateway address is 140.159.122.190. - The LAN operates on a class A sub-network: 10.10x.1y0.0/23 where x, y is the last two digits of the student id of one group member.( the last two digits of my student id is 72) o For instance, if the last two digits 09 then the subnet is 10.100.190.0/23 - Available networking devices and accessories that you can use in this project: o Cisco 2950/2960 series switches o Cisco ISR router 2620 series with all available modules o All types of network cables and connectors Your task: Design and configure the LAN to meet the design requirements. • The design document should include o A network diagram of the LAN with detailed information to show the functionality of each network device in the diagram. o A site map that show the deployment location of each network device in the site o A detailed list of the network inventories including:  The network devices with detailed specification and amount of each type  Network cables and estimated amount of each cable type in meters,  Any other accessories such as connectors and tools. o An IP network addressing plan that specifies:  For each subnet, the network address, broadcast address, valid host address range that will be assigned to the PCs. Note that you need to spare 10% of the total addresses of each subnet for future development.  The IP address of each router interface.  Any unused address space • The configuration document includes o Detailed configuration commands for all routers and switches o A packet tracer file implements a simplified solution of the LAN  Each sub-network has 2 computers o Screenshots from packet tracer showing you can connect between sub-networks and the gateway (using ping to verify the connectivity) Time frame: - Project is given on week 7 - Project presentation is due on week 12 (Monday) - Final project submission is due on week 12 (Friday) - No extension will be given unless special consideration is approved by the unit coordinator. Each day late, 10% of the total mark will be deducted. Marking schemes: 1. Solution (50%): a. Working solution: 40% b. Optimality: 10% 2. Documentation and presentation (40%) a. Sufficient information as required: 30% b. Well presentenced: 10% 3. Oral presentation (10%): 5-min presentation to explain the design solution with Q&A