SAMPLE RISK MANAGEMENT PLAN (This is a guide only)
(Insert name of event and date)
This plan is based on AS/NZS 4360 – Risk Management
This plan was developed to assist persons in the development of a Risk Management Plan only and is therefore to be used as a guide only. This example may not be applicable to your event; You are to ensure your RMP complies with the relevant Australian Standard; You are to develop a new type written plan, do not fill in the blanks on this example.
PLAN (Guide Only )
CONTENTS PAGE
1.0 Introduction and Context 2.0 Definitions 3.0 Stakeholders in Risk Management Plan 4.0 Risk Identification 5.0 Assessing Potential Risks 6.0 Evaluating and Treating Potential Risks 7.0 Risk Action Plan
Appendix 1 Template of Risk Register
Appendix 2 Template of Risk Treatment Schedule
Appendix 3 Template of Risk Action Plan
1.0 Introduction and Context
The event titled ________________________________________ is being organised by __________________________ and will take place on _______________________. The objective of the event is – _______________________________________________________________________________________ _______________________________________________________________________________________ The context within which this plan has been developed is
(As an example: the context within which this plan has been developed is to run the most successful event possible, ensuring at the same time the patrons attending in the event are protected from harm, the property and environment are protected from damage and the event provides a positive contribution to the community while enhancing the reputation of the Shire of Northam.) 1.1 Background/Event Scope (An overview of the event should be provided here. The overview should create an image in the readers mind and set the scene for the rest of the document. The following headings should be used as a guide to describe your event. Background of Event:‐ Details Activities of the Event:‐ Environment – Location & Layout:‐ Activities Requiring Permits:‐ 1.2 Organisational Details Give full details such as the following:‐ Organisation coordinating the Event: Name individuals responsible for the Event: Contact Phones: Email: Name of Event: Date of Event: Setup Times: Location of Event: 2.0 Definitions Risk – The chance of something happening that will have an impact on objectives. Risk Assessment – The overall process of risk identification, risk analysis and risk evaluation.
Risk Management – The culture, processes and structures that are directed towards realising potential opportunities, whilst managing adverse effects. Risk Reduction – Actions taken to reduce the likelihood, negative consequences or both, associated with a risk. Risk Treatment – The process of selection and implementation of measures to modify risk. Risk Transfer – The process of selection and implementation of measures to modify risk. Risk Acceptance – Risk acceptance is the acknowledgement that there is a risk and of the consequences that may result, which is accepted. 3.0 Stakeholders in Risk Management Plan (At this point detail all agencies, organisations and businesses who are involved in preparing and providing input into the Risk Management Plan. Indicate who was involved in the consultation process). 4.0 Risk Identification The following checklist items are not exhaustive, but can be used as a prompt. You will also need to consider site and event specific risks such as drowning if your event is in a reserve which has lakes. People Hazardous materials Disorderly unruly behaviour Chemical hazards Public accessing non‐public areas of event Pyrotechnics/ Fireworks Misuse of amusements and rides Fuels i.e. Petrol, LPG, Diesel Drug and/or Alcohol affected persons Criminal Activity Technical Management Overcrowding Inadequate site management Terrorism/Bomb threat Lack of staff briefing Medical Emergency (i.e. Heart Attack) Communications failure Lost Children Power failure Water Hazard ‐ drowning Water failure Lack of patron awareness of facility locations Toilet failure Unregistered food vendors Trip/Slip Hazards Unsafe temporary structures Electrical cables Extreme weather Uneven ground, loose surfaces Electrocution/shorting out Flooring design/surface Fire Lighting Climbing for vantage points Health Traffic congestion Food poisoning Collisions Disease outbreak Emergency Services access Animal to human spread of disease Excessive noise levels
Vehicular Temporary fencing Disabled parking Lack of parking spaces
Accessibility Inadequate seating space Inaccessible toilet facilities Difficulty touring through event site
Waste Inadequate number of toilets Insufficient rubbish bins Inadequate maintenance of toilets Inadequate emptying/cleaning of bins Needles/ Syringes Litter collection Sunburn/ Dehydration Collection/removal of wastewater Smoking Site clean up
5.0 Assessing Potential Risk
Once risks are identified, they are evaluated on a two (2) dimensional matrix using a qualitative rating of the likelihood of the event occurring and the scale of the possible consequences. When risks have been identified, they are analysed by combining the consequences and likelihood to produce a level of risk. This form of evaluation provides a good graphical representation of how serious the risk is or where it lies within a group of risks. The risk analysis provides information critical to determining what risks need to be treated and what risks are accepted. Likelihood Level Descriptor Description A Almost certain Almost certain Expected to occur in most circumstances B Likely Will probably occur in most circumstances C Moderate Should occur at some time D Unlikely Could occur at some time E Rare may occur only in exceptional circumstances F Never It is not foreseeable that this will occur Consequence Level Descriptor Description 1 Insignificant No Injuries low financial loss 2 Minor First Aid treatment medium financial loss release immediately contained 3 Moderate Medical treatment required high financial loss on site release contained with outside assistance 4 Major Extensive injuries major financial loss off‐site release with no detrimental effects
loss of production capability 5 Catastrophic Death huge financial loss toxic release off site
Likelihood Consequences 1 2 3 4 5 A S S H H H B M S S H H C L M S H H D L L M S H E L L M S S
Legend: H High risk; detailed research and management planning required at senior levels S Significant risk; senior management attention needed M Moderate risk; management responsibility must be specified L Low risk; manage by routine procedures
Table 4: Risk Register
Compiled by: ____________________________________________________ Date: ____________________________________ Reviewed by: ____________________________________________________ Date: ___________________________________ Function / Activity: _______________________________________________ CategoryRisk – what and how can it happen ConsequenceLikelihoodExisting ControlsConsequence Rating Likelihood Rating
Level of Risk
Risk Priority
Health/ Injury/Disease
Marquee collapse Event evacuation (Economic cost) News coverage (Loss of reputation) Legal action (Financial loss) Injury to people (Economic loss)
Unlikely Employed a hire company to install marquee. Obtained structural certification from Engineer.
3 D Medium 1
6.0 Evaluating and Treating Potential Risks
Table 5: Risk Treatment Schedule and Plan Compiled by: ____________________________________________________ Date: ____________________________________ Reviewed by: ____________________________________________________ Date: ___________________________________ Function / Activity: _______________________________________________ Risk Possible Treatment Options Preferred Options Risk Rating BEFORE Treatment Risk Rating AFTER Treatment Cost/benefit Analysis A – Accept B ‐ Reject Person Responsible for Implementation Time ‐TableHow will it be monitored? Marquee Collapse 1.Not install marquee. 2.Have installer sign certification once installed. 3.Ensure First Aid qualified personnel are employed at the event. 4.Obtain from installers a wind speed which once reached must be taken down 2 and 43 + D = M (Medium) 3 + E=L (Low)AName & PositionImmediate and ongoing as required. Event Organiser to advise Installers of requirement for checklist to be completed prior to event. Checklist to be retained once completed. Procedure for dismantling of marquee to be developed based on wind speed prior to event. Wind speed to be monitored during event.
7.0 Risk Action Plan
For those risks that are High, Extreme or deemed to be unacceptable, they need to be evaluated and specific action plans need to be developed to manage the risk appropriately. Table 6: Risk Action Plan Table
(Example of Risk Action relating to “Marquee Collapse”) RISK ACTION PLAN Item 1 Risk Marquee Collapse Summary (recommended response & impact) To ensure that the marquee Installer completes an inspection checklist, submits it to the event organiser and to develop a procedure to have the marquee dismantled in the event of unacceptable wind speed, to ensure that the risk of collapse is acceptable. Proposed Actions Contact marquee company and advise that they will need to complete it and submit it to the event organiser once the marquee is erected. Develop a procedure for dismantling of the marquee in response to unacceptable wind speed. Resource Requirements Time of Event Organiser Access to computer Phone Responsibilities Responsibility of Event Organiser to contact marquee company, collect completed checklist from installer and to develop dismantling procedure. Marquee company to be contacted with regard to level of wind speed that is unacceptable. Timing Procedure to be completed prior to event. Marquee company to be notified of checklist requirement one month prior to event. Reporting/Monitoring Event organiser to remind marquee company of checklist requirement within 7 days of the event. Completed checklist to be obtained from installer immediately after erection of marquee.
Appendix 1 TEMPLATE OF RISK REGISTER Risk Treatment: ___________________________ Compiled by: ________________________ Date: ___________________ Reviewed by: _______________________________ Date: _____________________ Function / Activity: ______________________________________________________ Category Risk What & how can it happen ConsequenceLikelihoodExisting ControlsConsequence Rating Likelihood RatingLevel of Risk
Appendix 2 TEMPLATE OF RISK TREATMENT SCHEDULE Compiled by: ________________________________ Date: ___________________ Reviewed by: _______________________________ Date: _____________________ Function / Activity: ______________________________________________________ Risk Possible Treatment Options Preferred OptionsRisk Rating BEFORE Treatment Risk Rating AFTER Treatment Cost/Benefit Analysis A: Accept B: Reject
Person Responsible for Implementation
TimetableHow will it be monitored
Appendix 3 TEMPLATE OF RISK ACTION PLAN RISK ACTION PLAN Item Risk Summary (recommended response & impact) Proposed Actions Resource Requirements Responsibilities Timing Reporting/Monitoring