Page 1 of 2
ITSA2005 Project Assignment – Term 1 2017
ITS2005 – Planning and Implementing Server
Project Assignment - Term 1 2017
Designing and Planning an Automated Server Installation Strategy
Weighting: 20%
Due Date: Sunday, 4 June 2017
This assessment item requires you to work in a group of 3 or 4 students.
Task:
Your task is to consider the given scenario and create a proposal in a form of a project report that
addresses the given requirements.
The report should be prepared using Microsoft Office documents and it should be uploaded on to
Moodle as a Microsoft WORD document. The word limit of the report is 1000 words. The word
count should not include the contents in the Cover Page, Table of Contents, Executive summary,
List of References and the contents in the Appendix.
The report should be a properly constructed academic report. It should contain an effective
introduction, body and conclusion. A reference list formatted in the Harvard style is required, at the
end of the report.
Submission guidelines:
The report should have a consistent, professional, and well-organized appearance.
1. Your report should include the following:
- The cover page must identify all group member details, including student names
and the ID numbers, course details, and the assignment details.
- The assignment must use 12 point font size and at least single line spacing with
appropriate section headings.
- The report must include executive summary, table of contents, introduction,
discussions with headings and sub-headings to address the requirements given,
conclusions, recommendations, references and appendices.
- Any supporting material, including diagrams, charts etc. could be included in an
appendix attached at the end of the report.
- In-text referencing in Harvard style must be cited in the text of the report, and
listed appropriately at the end in a reference list.
2. The report must be submitted in soft (electronic) copy as a Microsoft Word document via
the upload link available on Moodle.Page 2 of 2
ITSA2005 Project Assignment – Term 1 2017
Project Overview:
You are a new administrator for the Contoso Corporation, which is a leading producer of smart
devices for homes. You need to develop an automated installation strategy.
The Contoso Corporation design team is close to finishing up a new product for home security
monitoring and medical monitoring equipment. As a new administrator, you are called into your
manager’s office to discuss this exciting new project. He explains that the product is centered
around a server that collects and analyzes information from wireless nodes around the house or
worn by an individual. To keep track of data, the server will use Windows Internal Database (WID).
As part of the rollout, hundreds of servers will need to be prepared for the product rollout and
additional servers will be needed to replace sold inventory.
Your manager wants you to design a solution that can create hundreds of new servers each month.
You must work with the design team to create an automated server installation plan that will
support this project. The servers will have to be tested by the quality control team before being
shipped to customers.
Create a proposal that includes the following sections:
- Purpose of the Project
- Requirements of the Project
- The Proposed Solution
When writing the proposal, you must explain the reasoning behind your choices.
In working on this proposal, you need to refer to Server Lab 1 and Server Lab 2 you were asked to
complete and submit as part of lab assessment in this course. You should use those labs as a guide in
preparing this proposal.
Submit your proposal as a report according to the requirements and guidelines explained above.